Bid Awarded · Utilities · $7,900.20
City of Perham is procuring an Abriox Osprey solar-powered pressure monitoring system from Mobiltex to provide real-time alerts for the municipal g...
City of Perham · Otter Tail · Apr 8, 2026
Otter Tail, Minnesota
12 active signals tracked daily.
Monitor City of Perham in Otter Tail, Minnesota for upcoming contract opportunities. Vendor Radar tracks city council agendas, planning documents, and procurement notices to surface Construction, Engineering Services, Utilities, Waste Hauling, IT Services signals before formal bids are posted.
Bid Awarded · Utilities · $7,900.20
City of Perham is procuring an Abriox Osprey solar-powered pressure monitoring system from Mobiltex to provide real-time alerts for the municipal g...
City of Perham · Otter Tail · Apr 8, 2026
Bid Awarded · Construction · $374,655.00
Perham approved a base-bid award to Hammers Construction for a new golf cart shed, signaling near-term follow-on procurement for shed-related site/...
City of Perham · Otter Tail · Mar 9, 2026
Bid Awarded · Construction · $50,000.00
Perham approved Widseth’s architectural design proposal for an Operation Trail Head Facility at Arvig Park, and the design package is intended to s...
City of Perham · Otter Tail · Mar 9, 2026
Rfp Anticipated · Utilities
After a planned March 17 property-owner meeting, the city will develop final plans to bid the 2026 lead service line replacement project, indicatin...
City of Perham · Otter Tail · Mar 9, 2026
Bid Awarded · Waste Hauling
The city approved a household hazardous waste mobile collection event with Otter Tail County Solid Waste, which can foreshadow similar future HHW c...
City of Perham · Otter Tail · Mar 9, 2026
Rfp Anticipated · Engineering Services · $12,500.00
City of Perham is moving toward contract approval in March 2026 for a space needs assessment of its Emergency Services facilities, signaling an upc...
City of Perham · Otter Tail · Feb 18, 2026
Budget Allocation · Construction · $12,500.00
The City’s planned space needs assessment has a stated not-to-exceed fee of $12,500, indicating funded professional study work that often precedes ...
City of Perham · Otter Tail · Feb 18, 2026
Rfp Anticipated · Construction
Perham’s Main Street project is moving toward closeout with remaining minor correction repairs in early summer 2026, which often leads to smaller f...
City of Perham · Otter Tail · Feb 9, 2026